VectorMEP
Plumbing workflow
Sanitary fixtures, drainage at a fall, cold and hot water, the EN 12056-2 calculation.
- Collectors and stacks.
VMPIPEDRwithsLope(the fall in %, Down or Up from the first point); a branch off a sloped collector keeps the fall;Heightdrops a stack. - Water.
VMPIPECWandVMPIPEHWfor the mains; a hot water cylinder fromVMINSTALL. - Fixtures.
VMINSTALL: wall-hung or floor-standing WCs, washbasins, shower trays, bathtubs, floor drains with vertical or side outlets, linear drains, gullies — their back against the wall. - Connect.
VMSANCONNECTpipes every fixture at once: the drain into the wall, down through the slab and across to its collector at the fall you choose; the water to its mains on the same storey. - Calculate.
VMDRAINCALC: the frequency of use (K), then each pipe's discharge units, flow, capacity, filling, velocity and the advised size.
See the pictures on the Plumbing page.
Next: Electrical workflow →